A downloadable game for Windows, macOS, Linux, and Android

Download NowName your own price

๐Ÿš— MR.DRIVER 2D — FULL VERSION

Drive fast. Drift hard. Race your way to the top.

MR.DRIVER 2D is a fast-paced 2D driving game built around speed, precision, drifting, and competition.

Take control of your car and push it to its limits. Race through winding circuits, throw the car sideways into corners, fight for the perfect racing line, and master your timing to squeeze every bit of performance out of your machine.

This is the complete experience — 150 handcrafted stages across three disciplines, from your first sunny lap to headlight duels in the dead of night.

๐Ÿ RACE — 60 stages — Compete against AI drivers, find the fastest lines, overtake your rivals, and fight your way to victory. Circuits get tighter, rivals get faster, and the sun goes down: race through day, dusk, and full night with working headlights.

๐Ÿ’จ DRIFT — 60 stages — Forget the finish line. Build your score, chain your slides, and keep the car under control while pushing your drift further and further — smoke looks even better under the night sky.

โšก DRAG — 30 stages — Pure acceleration. Perfect your shifts, launch cleanly, and see who reaches the finish first.

๐Ÿš— GARAGE — 10 cars — Build your ride your way. Collect all ten machines, change their colors, customize wheels and wings, and create a setup that feels like yours.

๐ŸŒ FREE MODE & TRACK EDITOR — Set your own rules: pick any track, any lap count, any rivals. Or draw your own circuit from scratch in the editor and race it.

๐ŸŽฎ Multiple ways to play — Keyboard, controller, and touch controls are supported, with options designed to make the game feel natural whether you're playing at your desk or on a touchscreen. Runs offline on Windows, macOS, Linux, and Android — no internet needed after download.

๐Ÿ”„ Coming from the demo? Your progress carries over — export your save in the demo, import it here, and keep driving right where you left off.

๐ŸŽฎ Not sure yet? [Try the free demo in your browser โ†’ https://ali10hb.itch.io/mrdriver-2d-demo

๐Ÿ† Master the drive

MR.DRIVER 2D isn't just about holding the accelerator. It's about knowing when to push, when to brake, when to slide, and when to take the risk.

A perfect corner can save a race. A perfectly timed shift can give you the edge. A clean drift can turn a simple corner into a massive score.

And sometimes... one mistake is all it takes.

Download

Download NowName your own price

Click download now to get access to the following files:

MRDRIVER2D-Windows-x64 (1).zip 949 kB
MRDRIVER2D-Linux (1).zip 1 MB
MRDRIVER2D-Android-offline (1).zip 39 kB
MRDRIVER2D-macOS (1).zip 1.2 MB

Development log

Leave a comment

Log in with itch.io to leave a comment.